Stamping dies for automotive metal parts such as stainless steel/copper/carbon steel/high-strength steel

{Product material}: SUS304, SPCC and so on{Scope of application}: Automotive Stamping die{Die types}: Single process{Mould Life}: 50~100 shots{Tolerances}: 0.02{Processing Date}: 35~45 days{Spare parts}: PUNCH, MISUMI and so on{Equipment}: 400T Punch{Produce equipment}: 315T Hydraulic machine/press, 400T\\200T\\160T Punch (With

Featured Products

Stamping Die/Tooling for Auto Metal Parts Including Stainless Steel/Copper/Carbon Steel/High-Strength Steel

Stamping Die/Tooling for Auto Metal Parts Including Stainless Steel/Copper/Carbon Steel/High-Strength Steel
Stamping Die/Tooling for Auto Metal Parts Including Stainless Steel/Copper/Carbon Steel/High-Strength Steel
Stamping Die/Tooling for Auto Metal Parts Including Stainless Steel/Copper/Carbon Steel/High-Strength Steel
Stamping Die/Tooling for Auto Metal Parts Including Stainless Steel/Copper/Carbon Steel/High-Strength Steel
Stamping Die/Tooling for Auto Metal Parts Including Stainless Steel/Copper/Carbon Steel/High-Strength Steel
{Product material}: SUS304, SPCC and so on
{Scope of application}: Automotive Stamping die
{Die types}: Single process
{Mould Life}: 50~100 shots
{Tolerances}: 0.02
{Processing Date}: 35~45 days
{Spare parts}: PUNCH, MISUMI and so on
{Equipment}: 400T Punch
{Produce equipment}: 315T Hydraulic machine/press, 400T\200T\160T Punch (With the belt feeding machine), 110T, 80T, 40T Punch equipment, Can meet the need of mass production and testing.


{Service content}: Designing and manufacturing for metal mould and products.
{Main customers}: Haier, Hisense, Midea, Siemens, Sanyo, Electrolux, Toyota, KIA, Foton, SGMW, SKYWORTH etc.
{Main export markets}: Japan, Korea, Thailand, Russia, Germany, Britain, Norway, Italy, Spain, Turkey; America, Brazil, Argentina; South Africa Egypt; Iran, Pakistan, India etc...
{Mold paint}: Painting color depends on customer requirements
(Packaging: Wooden case)

The first trial success rate is above 95%
{Quotation time}: We will quote in 24 hours after receiving the customer's drawings.
{Data needed to offer}: 2D/ 3D drawing or samples
{Quotation}: Including the accurate price/stage/life and process time.
{The profile}: 2D/3D drawing or samples
{Project Manager}: Concentrate on project tracking and after service
{Engineer}: 30-50 excellent engineers, have many years experience and English communicate well.
{Warehousing and logistics}: The purchase department use EPR system to make sure buying materials in time.
{Fitter technician}: 100-130 experienced workers can meet the customer request of batch production.
{Quality department}: 15 members quality control workers, measuring the mould and parts by CMM and projector.
{Domestic delivery}: Logistics transportation
{Delivery to overseas}: FOB/CIF/DDU by sea shipping or air shipping
FitterQuality testing
First die by the fitter for a thorough inspection of the mold as follows:Die size (I* W * H)
Die accessories are completeIf the mold specification matching and customer equipment(height, the size of a mould, mould position)
Ensure the mold factory 100% acceptance (including:assembly, test mode etc.)There is no die shank (reasonable)
According to the customer request is equipped with the factory.Die code is complete (item, process name)
Die appearance: template logo are complete; the surfacerust are clean, then coated with anti rust oil, wooden packing.Whether to need to mold brand
With mold factory dataOn the,In the lower limit of a column is complete, paint color and reasonable
 Mold inserts, punch is complete
 Screw dismounting have wear / screw holes are offset
 The die structure is reasonable / mould factory data is complete

Contact us

Please feel free to give your inquiry in the form below We will reply you in 24 hours